Title: Fairfield Art Centre
Sector: Public Sector
Date of completion: September 2018
Location: Fairfield
Project timeline (weeks): 10 weeks
Value: £170,000
Description of project:
Strip out existing boiler plant and hot water system, reinstallation of new boiler plant and BMS Control Systems. Installation of instantaneous water heaters.
Work completed:
- BMS Control
- LTHW Heating
- Gas-fired Hot Water System
- Natural Gas
- Testing and Comissioning